SURFACE PREPARATION
All Surfaces to be coated should be clean, dry and free from contamination. Prior to primer application all surfaces should be assessed and treated in accordance with SSPC-SP13/NACE.6
Concrete should be cured for a minimum of 28 days prior to coating. The moisture content of the concrete should be below 4%. All cracks should be filled with ABADUR MP.
Surface preparation shall not take place in following conditions:
- At temperature below 5 ºC.
- When the relative humidity is greater than 80%.
- When the surface temperature is less than 3 ºC above the dew point.
- Outside day light hours on exterior locations.
Application Method
Material is supplied in two containers as a unit. Always mix a complete unit in the proportion supplied and use within the working Pot life specified.
1-Agitate part A with a power agitator.
2-Combine the entire contents of part B with Part A and mix thoroughly with power agitator. Start the application right after mixing.
In hot climate, material temperature should be 20 to 25 ºC prior to mixing; otherwise pot life becomes very short.
- Do not thin for any reason.
- Do not apply the paint when wind speed is in excess of 7 m/s.
- Do not apply the paint when surface temperature is below 10ºC.
Application Equipments
Air less Spray
|
Tip range 0.017-0.021 inch
Total output pressure at spray tip not less than 110 bar (1600 psi)
|
Air Spray
|
Nozzle orifice : 1.8- 2.2 mm
Nozzle pressure:3-6 Bar (40-90psi)
|
Brush
|
applicable
|
Roller
|
applicable
|
.