Address No. 65, Shahid Ghandi St., North Sohrevardi Ave., Tehran, Iran

Phone +98 21 87754

E-Mail Address info@abadgarangroup.com

Abadgaran Group Office
Address End of West 6th St., Safadasht Industrial Zone, Safadasht, Malard Road, Karaj, Iran

Phone +98 21 65741911-5

Abadgaran Group Factory
Thank you for giving us the opportunity to serve you better. Please help us by taking a few minutes to tell us about the service that you have received so far.
phone
instagram
telegram
aparat

ABABOND WR-600

HIGH PERFORMANCE TWO-COMPONENT EPOXY ADHESIVE ANCHORING SYSTEM FOR THREADED RODS AND REINFORCING BARS IN WATER FILLED CONCRETE HOLES

DESCRIPTION

ABABOND WR-600 is an injectable two-component, solvent-free and high performance epoxy adhesive with modified rheology, suitable anchor system horizontally, vertically and roofing inside for threaded rods and reinforcing bars in concrete. This epoxy-based adhesive with special compounds is capable for heavy loading in various structural operations and suitable for water saturated and water filled hole concrete applications. Resin and hardener are stored in two separate chambers and are not mixed and activated until extrusion through the static mixer.

Use the smart planting glue calculator to calculate the amount of planting glue needed for construction projects.

ABABOND WR-600

SURFACE QUALITY:

  • The age of mortar and concrete must be at least 28 days.
  • Substrate strength (concrete, masonry, natural stone) must be verified.
  • The anchor hole must always be clean, free from oil, dust, and grease, etc.
  • Loose particles must be removed from the holes.
  • Threaded rods and rebars have to be cleaned thoroughly from any oil, ice, grease or any other substances and particles such as dirt, etc.Important! Inadequate hole cleaning= poor load values

 

HOLE PREPARATION:

  • Drilling of hole with an electric drill to the diameter and depth required. Drill hole diameter must be in accordance with anchor size.
  • The drill hole must be cleaned with a blow pump or by compressed air, starting from the bottom of the hole.
  • Oil-free compressors shall be used.

 

For dry hole:

  • The drill hole must be thoroughly cleaned with a brush for 2 time. The diameter of the brush must be larger than the diameter of the drill hole.
  • The drill hole must then be cleaned again with a blow pump or by compressed air, starting from the bottom of the hole.

 

For water filled boreholes:

  •  Flush hole 2 times by inserting a water hose (water line pressure) to the back of the borehole until water runs clear.
  • The drill hole must be thoroughly cleaned with a brush for 2 times. The diameter of the brush must be larger than the diameter of the drill hole.
  • Flush again 2 times until water runs clear.

Attention: If there are any changes in conditions after cleaning the borehole (e.g. rain water filled in the borehole), repeat cleaning procedure again

 

ADHESIVE INJECTION

  • Remove the cap and replace it with the static mixer. Place it into the dual cartridge dispenser.
  • Discard approximately 30-40 cc of the initial mixed until an even color has been achieved without streaking in the resin.
  • Inject the adhesive into the hole, starting from the bottom, while slowly drawing back the static mixer. In any case avoid entrapping air. For deep holes extension tubing can be used. Fill hole approximately full.
  • Insert the anchor with a clockwise rotary motion into the filled drill hole. Some adhesive must come out of the hole.
  • The anchor must be placed within the open time. During the resin hardening time the anchor must not be moved or loaded.
  • Wash hands and skin thoroughly with warm water and soap.

  • Injection system for installation and use in dry, wet, water saturated and water filled hole concrete
  • Injection system with high loading capacity
  • high chemical resistance
  • Large diameter applications
  • Anchoring without expansion force
  • Excellent bond performance
  • Suitable working time even at elevated temperatures
  • Styrene-free
  • Odorless epoxy resin

  • Adhesive anchoring into concrete substrates
  • Anchoring of supports for ducting and equipment

TECHNICAL DATA

Color

Gray 

Mixing Ratio

1:3(by volume)

Density (A+B)

Approx. 1.40 

Volume Solid

100%

Compressive strength at 25°C (MPa) [after 1 days] (ASTM D695)

~80

Compressive strength at 25°C (MPa) [after 7 days] (ASTM D695) ~100 
Slant shear at 25°C (MPa) [after 7 days] ~15
Substrate temperature (°C) 10 – 40

Ambient temperature (°C)

10 – 40

 

PACKAGING

600 ml dual cartridge.

 

STORAGE & SHELF LIFE

The shelf life is 12 months if unopened, stored free from frost, moisture and direct sunlight at temperatures between +10°C and +30°C.

HEALTH & SAFETY

Keep away from heat and open flame. Keep container closed. Use with adequate ventilation. Avoid prolonged and repeated contact with skin.

MSDS is available at ABADGARAN website.

 

TECHNICAL SERVICE

The ABADGARAN INTERNATIONAL GROUP Technical Department is available to assist you in the correct use of our products and its resources are at your disposal entirely without obligation.

 

WE DEVELOP CHEMISTRY